This project is the first closed hall for horse racing in Croatia. The main girder construction is a triple joint frame with bending-stiff frame corners. For the entire construction, 330 m³ of glulam timber of wood species spruce and strength class GL24h were used.
| Project information | |
|---|---|
| Customer: | STENAVERT | 
| Architect or planner: | STUDIO ARS TEMA | 
| Structural analysis and design: | STUDIO ARS TEMA | 
| Building owner: | Goran Golubicek | 
| Year of construction: | 2018 | 
| Products used: | 330 m³ of glued laminated timber | 


 
  DE
 DE IT
 IT CZ
 CZ
